Flowline Badr#3
Location | Cherouq concession |
Year | 2010 |
Client | PIONEER |
Project Description | Engineering, procurement and construction of 8” Oil flow line, relevant interconnection piping, Road Crossing, Inspection, Hydrotest and Start-up for Badr#3 Well Head: • Pipe Schedule: 40 • Material : API5L Gr B • Pipeline Length : 0,5Km ’Badr #3 Tie-in with the existing FlowLine Badr#1 was performed without shutdown based on Hot Tapping Technique : attaching branch connection and cutting hole into the operating Badr#1 pipeline using Mirage Hot tap machine (8’’*6’’) |