6” HDPE fire water system for the gas lift plant at Waha CPF
Location | Cherouq concession |
Year | 2011 |
Client | OMV |
Project Description | Engineering, procurement, construction and testing of of 6” HDPE Buried Fire Water System for the Gas Lift Plant at Waha CPF: • Line Diameter : 6”, 4” & 2” • Pipe Schedule: PN20 • Material : HDPE • Pipeline Length : 0,5Km |