12” and 2” Jetty Lines at Zarzouna
Location | Zarzouna/Bizerte |
Year | 2011 |
Client | STIR |
Project Description | Engineering, procurement and construction of 12”Oil jetty line & 2” condensate jetty line, relevant interconnection piping, supports, Inspection, Hydrotest and Start-up: • Line Diameter : 12” & 2” • Pipe Schedule: 40 • Material : API5L Gr B • Pipeline Length : 0,5Km (each one) |
- CATEGORY Pipelines
- TAGS