16” and 8” jettylines at Port Zarzis
Location | Zarzis port |
Year | 2012 |
Client | MARETAP |
Project Description | Oil 16” & 8” jetty lines, 12” & 8” firewater line & 2” air line installation, relevant interconnection piping, supports, Inspection, Hydrotest and Start-up for Jetty Lines: - Carbon Steel : • Line Diameter : 16” & 8” • Pipe Schedule: 40 • Material : API5L Gr B - HDPE • Line Diameter : 12” , 8” & 2” • Pipe Schedule: PN10 • Material : HDPE - Pipeline Length : 2Km (each one) The works included the construction of a new loading arm with relevant shelter and steel structure supports construction and painting |