OUED ELGHROUSS PUMPING STATION CONSTRUCTION
Location | Oued Elghrouss Tazerka |
Year | 2022 |
Client | ENI |
Duration | 4 months |
Project Description |
EPC for new pumping station construction at Oued Elghrouss Tazerka
Project general scope of work : • Detailed engineering of the installation • Civil works: inlet and discharge line installation, water tank, equipment foundation and Control room construction • Procurement of mechanical equipment: electropumps, surge vessel, odor treatment unit and penstock valves • Procurement of piping and valves • Procurement of MCC, electrical and instrumentation material • Procurement of photovoltaic material • Installation of the above equipment • Installation precommissioning, commissioning and start up |