Maintenance of two oil storage tanks S2 and S8
Location | Skhira |
Year | 2024 |
Client | TRAPSA |
Duration | 2 Years |
Project Description |
Maintenance of two oil storage tanks S2 and S8 •Engineering Procurement Tanks cleaning and desgassing Dismantling and removal of roof and bottom plates Bituminous concrete replacement Installation and welding of new roof and bottom plates Installation of new floating roof seal and drainage hose Foam and dewatering piping replacement Sand blasting and painting works Hydrostatic test Project general scope description : • Engineering • Rails fastening systems modification and retrofit • Steel bridge repair • Cracks treatment •Bridge bearings replacement • Steel structure sandblasting and painting |