16” and 8” jettylines at Port Zarzis

Location Zarzis port
Year 2012
Client MARETAP
Project Description Oil 16” & 8” jetty lines, 12” & 8” firewater line & 2” air line installation, relevant interconnection piping, supports, Inspection, Hydrotest and Start-up for Jetty Lines:
- Carbon Steel :
• Line Diameter : 16” & 8”
• Pipe Schedule: 40
• Material : API5L Gr B
- HDPE
• Line Diameter : 12” , 8” & 2”
• Pipe Schedule: PN10
• Material : HDPE
- Pipeline Length :
2Km (each one) The works included the construction of a new loading arm with relevant shelter and steel structure supports construction and painting