Flowline Badr #4
Location | Cherouq concession |
Year | 2011 |
Client | PIONEER |
Project Description | Engineering, procurement and construction of 8” Oil flow line, relevant interconnection piping, Road Crossing, Inspection, Hydrotest and Start-up for Badr#4 Well Head: • Pipe Schedule: 40 • Material : API5L Gr B • Pipeline Length : 1Km |