Project Description |
Engineering Procurement &Construction of Process Equipments Interconnecting Piping, relevant supports, Inspection and testing during the 2007 general shut-down of IKDEM FPSO EPI during the 2007 General Shut-down of :
• Degasser,
• Hydro cyclone,
• Riser vacuum,
• Power fluid guards filters,
• Water injection,
• Power fluid
• installation of Debris Strainers
- Piping Diametre: from 1” to 12”
- Sch : 40 & 80
- Material : CS & Duplex Steel
- Procurement 80T of piping and fittings
- Total Welded Inchs : 24000 |