Installation of desurchauffeur, Vase de revaporation& purgeur

Location STIR plant, Zarzouna
Year 2010/2011
Client STIR
Project Description Engineering, construction, inspection & Installation of ‘Desurchauffeur’, ‘Vase de revaporation’ & ‘Purgeur’ on STIR Plant during the general Shut-down on 2010-2011 with Piping installation, relevant supports, Inspection and testing
• Piping Diameter : 6”, 3” & 11/2”
• Sch : 40
• Material : CS
• Total Welded Inchs : 5000”
TOP