Installation of desurchauffeur, Vase de revaporation& purgeur
Location | STIR plant, Zarzouna |
Year | 2010/2011 |
Client | STIR |
Project Description | Engineering, construction, inspection & Installation of ‘Desurchauffeur’, ‘Vase de revaporation’ & ‘Purgeur’ on STIR Plant during the general Shut-down on 2010-2011 with Piping installation, relevant supports, Inspection and testing • Piping Diameter : 6”, 3” & 11/2” • Sch : 40 • Material : CS • Total Welded Inchs : 5000” |