New KO drums and 4 pumps installation in Oued zar

Location Oued Zar
Year 2020-2021
Client ENI
Duration 1 year
Project Description Flare revamping project at Oued Zar : EPC for 2 new KO drums and 4 pumps installation Project general scope of work :
• Detailed engineering of the installation
• 2 KO drums fabrication and test at NASR workshop
• Procurement of 4 pumps and 2 flame arrestors • Procurement of pumps control panels and electrical material
• Procurement of valves and instrumentation material
• Installation of the above equipment
• Piping fabrication and installation works with relevant supports
• Installation precommissioning, commissioning and start up