Substitution of lines at STIR platforming plant

Location Zarzouna
Year 2012/2013
Client STIR
Project Description Engineering &Construction of process piping at Platforming plant in STIR including relevant supports, Inspection & Testing:
• Piping Diameter : from 1” to 10”
• Sch : 40 & 80
• Material : A106 Gr B
• Total Welded Inchs : 13500”
• Installation Height : from 5 to 40 meter
TOP