REPAIR AND UPGRADING OF THE OFFSHORE JETTY BRIDGE AT TRAPSA OIL TERMINAL (SKHIRA)

Location TRAPSA oil terminal (SKHIRA)
Year 2020-2021
Client TRAPSA
Duration 2 years
Project Description REPAIR AND UPGRADING OF THE OFFSHORE JETTY BRIDGE AT TRAPSA OIL TERMINAL (SKHIRA) Project general scope description
• Engineering
• Complete renewable of defected concrete pier caps
• Complete renewable of the defected concrete braces
• Bridge concrete structure reinforcement by carbon’ layer installation
• Bridge steel piles corrosion repair and painting